Availability: | |
---|---|
Quantity: | |
FIM2
FST
FST12008
Installation requirements:
(1) Voltage: 3P 380~420V 50 HZ; 3 phase
(2) Installation place should be with good ventilation, away from dissipation devices and protected from direct splar radiation & rain , standard working environment temperature: 5℃~35℃;
(3) The ground should be level with good drainage system;
(4) Space for installation: checking below picture
Installation requirements:
(1) Voltage: 3P 380~420V 50 HZ; 3 phase
(2) Installation place should be with good ventilation, away from dissipation devices and protected from direct splar radiation & rain , standard working environment temperature: 5℃~35℃;
(3) The ground should be level with good drainage system;
(4) Space for installation: checking below picture
Contact Person : SUNNY SUN
Phone : +86-18698104196 / 13920469197
Whatsapp/Facebook : +86-18698104196
Wechat/Skype : +86-18698104196